China revises water law to protect rivers and lakes

A new chapter will define management areas, restrict development on riverbanks and require ecological water needs to be built into water-project operations.

China revises water law to protect rivers and lakes Rodolfo Gaion

China’s revised Water Law will take effect on 22 March 2027, introducing new rules for managing and protecting rivers and lakes. The revision was adopted at the 25th session of the Standing Committee of the 14th National People’s Congress and adds a chapter devoted to river and lake management.

The changes set out how management areas are to be identified and restrict certain land uses and construction within them. They also require ecological water-use scheduling to be incorporated into the daily operation of water projects. The rules address concerns over development and other activity that can affect flood safety and the ecological functions of waterways.

The Legislative Affairs Commission of the NPC Standing Committee said illegal occupation, extraction, dumping and construction still occur in some areas. It also cited encroachment by embankments, forests and tall-stem crops, as well as difficulties in consistently maintaining water flows needed by local ecosystems.

How management areas will work

The law calls for regular surveys and catalogue-based management of rivers and lakes, and requires management-area boundaries to be made public and marked with signs. For waterways with embankments, the area will include the water, sandbars and beaches between the banks, along with the embankments and their protection land.

Where there are no embankments, the area will cover the water, sandbars and beaches up to the historical maximum flood level or the flood level a project is designed to withstand. River basin management authorities will delineate areas for waterways they directly manage, in coordination with local governments at county level or above. Those governments will delineate areas for other rivers and lakes.

Restrictions and restoration

The chapter prohibits illegal occupation or use, and unauthorised construction, in river and lake waters and along shorelines. It also bans creating land by enclosing lakes, reclaiming river channels or filling in waterways. County-level and higher-level governments must organise the planned restoration of land that has already been occupied or reclaimed.

Land use in management areas must meet flood-discharge, water-conveyance and ecological-protection requirements. No new forestland or farmland may be added there. If existing forestland or farmland affects flood-control safety, provincial-level governments must arrange its adjustment and orderly withdrawal in accordance with the law. The revision also calls for comprehensive treatment and ecological restoration where river and lake ecosystems have deteriorated.

This report draws on information from chinadaily.com.cn.

Editorial checks passed Facts, figures and quotes checked against 1 source

Add China News as a preferred source on Google

Related stories